Project Information

Project Name:

15 MW bundled grid connected renewable energy project in Maharashtra, India

Country:

India

Description:

The objective of the project activity is to design, construct, operate and maintain a 15 MW wind power project in Maharashtra. The project aims to produce electricity by using wind power instead of fossil fuel based electricity generation plants.

Start Date:

26-03-08 00:00:00 (GMT)

Close Date:

24-04-08 24:00:00 (GMT)

Closed for Comment

   

Comments:

1

Project Design Documents

C Mahendra PDD_20.03.08.pdf [Size: 504 KB]

Comments

All received comments will be displayed, at the end of the 30 days commenting period, at the following address www.sgsqualitynetwork.com/tradeassurance/ccp/projects/project.php?id= 472 , as per PROCEDURES ON PUBLIC AVAILIBILITY OF THE CDM PROJECT DESIGN DOCUMENTS AND FOR RECEIVING COMMENTS AS REFERRED TO IN PARAGRAPHS 40b AND 40c OF THE CDM MODALITIES AND PROCEDURES.

Comment 1
27-03-08 3:05am

Name: Raghu

City: Aurangabad

Organisation: CDM Future

Country: India

1. I think our project developers and consultants are still unable to understand the issues with wind power projects.. This is one more project added to the party. I have never seen a wind mill being developed in any part of the country with just over 20% PLF that too for 1.25 MW wind mill. Additionality section need to be relooked very carefully and all the assumptions made are seems to be vague and made very conveniently to prove the additionality. It is also not clear why excel sheet is not uploaded at this stage.
2.Can PP/consultant prove the reduction in the average emission intensity (SOx, NOx, PM, etc.), average effluent intensity and average
solid waste intensity of power generation in the system in absolute terms as a part of sustainable development benefits of the project. Pls indicate the figures in the PDD.
3. Consultant is totally ignorant on mentioning the enough valid reasons for the delay in applying the project for CDM.DOE should look in to this issue and should not submit for EB unless dully satisfied.
4. Wind power is entirely dependent on the wind availability, terrian and soil roughness in the area. If these factors are favourable, wind can be viable at any place irrespective of the state or location. It is amusing to read the common practice analaysis comparing total wind capacity out of total generation. This will be remain like this for decades in India and wind can never be common practice on this basis. Pls do not make such stupid analysis to fool the EB and RIT.
5. Moreover, the additionality section seems to be copied from the another wind project applied for validation. This indicates the consultant's capability in handling the projects. Poor project developer must have no idea on this and suffer for consultant's mistakes later when it comes for review.
6. From the stakeholder section, it is clear that no formal stakeholder meeting is conducted which is against the required procedures. DOE should look this issue very seriously.

For further information...
For more information please email or fax +44 (0) 1276 697 833.

Medical Devices
Articles
CDM Projects
Articles
News
  Back to Top
Terms & Conditions, Privacy, © 2010 SGS