Project Information
| Project Name: |
Switching fossil fuel in an industrial facility |
| Country: |
India |
| Description: |
Present project activity is proposed to install a Biomass (Empty Palm Fruit Bunches) fired Hot Air Generator for supplying hot air to the Spray Drier which displaces use of HSD as fuel. The project activity results into reduction in GHG emissions associated with HSD burning. The installed capacity of The Kerala Ceramics Limited (TKCL) is 24,000 MT of Kaolin production per Annum. Electric power requirements are met from KEB supply while thermal energy is sourced from combustion of High Sulphur Diesel (HSD).
|
| Start Date: |
08-05-08 00:00:00 (GMT) |
| Close Date: |
06-06-08 24:00:00 (GMT)
Closed for Comment |
| |
|
| Comments: |
0 |
Project Design Documents
Kerala ceramics 2nd PDD - version 05.pdf [Size: 457 KB]
Comments
All received comments will be displayed, at the end of the 30 days commenting period, at the following address www.sgsqualitynetwork.com/tradeassurance/ccp/projects/project.php?id=
483 , as per PROCEDURES ON PUBLIC AVAILIBILITY OF THE CDM PROJECT DESIGN DOCUMENTS AND FOR RECEIVING COMMENTS AS REFERRED TO IN PARAGRAPHS 40b AND 40c OF THE CDM MODALITIES AND PROCEDURES.
For further information...
For more information please email
or fax +44 (0) 1276 697 833.
|