Project Information
| Project Name: |
Surin Electric Project |
| Country: |
Thailand |
| Description: |
The project takes place at Surin Electric Company Ltd and involves the generation of electricity from the combustion of bagasse, a renewable biomass. The project involves the installation of a 10MW backpressure Toyodenki turbo generator. The turbine generator will produce electricity at 3.3kV which will be stepped up at the plant to 22 kV and then supplied to the grid via the Surin substation 40km from the plant. A previous submission of the PDD for this project can be found here |
| Start Date: |
17-04-08 00:00:00 (GMT) |
| Close Date: |
16-05-08 24:00:00 (GMT)
Closed for Comment |
| |
|
| Comments: |
0 |
Project Design Documents
Korach cogen PDD Mar 2008 v1.pdf [Size: 778 KB]
Comments
All received comments will be displayed, at the end of the 30 days commenting period, at the following address www.sgsqualitynetwork.com/tradeassurance/ccp/projects/project.php?id=
485 , as per PROCEDURES ON PUBLIC AVAILIBILITY OF THE CDM PROJECT DESIGN DOCUMENTS AND FOR RECEIVING COMMENTS AS REFERRED TO IN PARAGRAPHS 40b AND 40c OF THE CDM MODALITIES AND PROCEDURES.